Workplace Charging Scheme (WCS)

Office for Zero Emission Vehicles (OZEV) · United Kingdom

The Workplace Charging Scheme (WCS) provides financial support to organisations for the purchase, installation, and infrastructure of electric vehicle (EV) chargepoints at workplaces. It aims to accelerate EV adoption by expanding workplace charging facilities.

Summary

Deadline

30 Mar 2027

Complexity

Medium

Time to apply

20-60 hours

Updated

9 Jun 2026

The Workplace Charging Scheme (WCS) provides financial support to organisations for the purchase, installation, and infrastructure of electric vehicle (EV) chargepoints at workplaces. It aims to accelerate EV adoption by expanding workplace charging facilities.

Eligibility

Applicant types

Business, Public Sector

Business size

SME, Large

Industries

All sectors with workplace parking facilities

Match funding

Required

Requirements

Businesses, charities, public sector organisations, and small accommodation businesses Businesses, charities and public sector organisations with dedicated off-street parking for staff/fleet; up to 40 sockets (£500/socket from Apr 2026).

Eligible applicants

Businesses, charities, public sector organisations, and small accommodation businesses

Funding and scope

Benefit amount

Amount needs verification

Total fund available

Not specified

Funding intensity

Not specified

Payment type

Reimbursement

Eligible expenses

Not specified

Ineligible costs

  • Installations required by regulation or planning conditions
  • customer-only parking locations
  • previously funded sites

Application and risks

Application platform

Workplace Charging Scheme online application portal

Competitiveness

Open (Rolling assessment)

Decision timeline

Not specified

Assessment process

Voucher issued within 5 working days if approved; installer claims grant after installation

Application sections

Not specified

Application components

  • Online application form, business verification (Companies House, VAT, or equivalent), site details, installer details

Required documents

Not specified

Appendices

Not specified

Assessment criteria

  • Eligibility compliance, appropriate site setup, and adherence to scheme rules

Decision risks

Non-compliance may result in voucher withdrawal, grant rejection, or audit recovery

Timeline and partners

Opening date

31 Mar 2022

Project duration

Not specified

Project start

Not specified

Project end

Not specified

Co-funders

Not specified

Collaboration rules

  • Organisation applies for voucher; approved installer submits claim after installation.

Consortium requirements

  • Single organisation applicant; OZEV-approved installer claims grant.

Additional guidance

[{"label":"Key Organisational Requirements","value":"Must own or have permission for the site; must have off-road parking designated for staff/fleet use; must use authorised installers and eligible chargepoints; must comply with subsidy control rules (£315,000 MFA limit over 3 years)"},{"label":"Governance Requirements","value":"Compliance with subsidy control rules and regulatory standards including fire safety obligations"},{"label":"Monitoring Requirements","value":"Installations may be audited; documentation and site access may be required"},{"label":"Funding Structure","value":"Covers up to 75% of costs (including VAT), capped at £350 per socket (increasing to £500 from April 2026); maximum of 40 sockets per applicant across all sites"},{"label":"Renewal Structure","value":"Extended until 31 March 2027"},{"label":"Environmental & EDI Requirements","value":"Supports transition to low-emission transport and sustainable infrastructure"},{"label":"important notes","value":"Voucher valid for 180 days; installer must claim grant; cannot claim the same chargepoint under multiple schemes; businesses may combine with EV infrastructure grant (with restrictions); public use allowed only under compliance with regulations"}]

Quick facts

Status
Open
Deadline
30 Mar 2027
Funding amount
Amount needs verification
Funding band
Not specified
Funding type
Capital grant
Payment type
Reimbursement
Audience
Business, Public Sector, Mixed
Industry
All sectors with workplace parking facilities
Last updated
9 Jun 2026
Published
Not specified

Source links

Secondary sources

Source 1