Skip to main content
Back to grants dashboard
ClosedUpdated 9 Jun 2026Business

EV infrastructure grant for staff and fleets

Office for Zero Emission Vehicles (OZEV) · United Kingdom

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.

Summary

Deadline

30 Mar 2026

Complexity

Medium

Time to apply

20-60 hours

Updated

9 Jun 2026

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.

Eligibility

Applicant types

Business

Business size

Micro, SME, Large

Industries

All sectors (SMEs with fleet or staff parking infrastructure needs)

Match funding

Needs verification

Requirements

SMEs with fewer than 250 staff; chargepoints for staff/fleet use only (not public). Scheme closed 31 March 2026.

Eligible applicants

Small and medium-sized businesses (249 employees or fewer), registered at Companies House or VAT registered with HMRC

Funding and scope

Benefit amount

Up to 75% of costs, max £15,000 per installation; up to £350/socket and £500/parking space with infrastructure

Total fund available

Not specified

Funding intensity

Not specified

Payment type

Reimbursement

Eligible expenses

Not specified

Ineligible costs

  • Installations that are mandatory under building regulations or planning conditions
  • public-use chargepoints

Application and risks

Application platform

OZEV Electric Vehicle Chargepoint Grants online portal

Competitiveness

Closed / Not accepting applications

Decision timeline

Not specified

Assessment process

Grant claimed via installer after installation; OZEV reviews and approves claim

Application sections

Not specified

Application components

  • Online application, installer details, property and parking details, company registration/VAT details

Required documents

Not specified

Appendices

Not specified

Assessment criteria

  • Eligibility compliance, correct installation setup, and adherence to scheme requirements

Decision risks

Application rejection if requirements not met; audits may result in withdrawal if non-compliant

Timeline and partners

Opening date

31 Mar 2022

Project duration

Not specified

Project start

Not specified

Project end

Not specified

Co-funders

Not specified

Collaboration rules

  • OZEV-approved installer submits claim on behalf of eligible business.

Consortium requirements

  • Installer-led grant claim; single business applicant per installation.

Additional guidance

[{"label":"Intent to Apply Deadline","value":"Not specified"},{"label":"Key Organisational Requirements","value":"Must be an SME; must not exceed £315,000 in minimal financial assistance over 3 financial years; must use OZEV-approved installer and eligible chargepoint"},{"label":"Governance Requirements","value":"Compliance with subsidy control (minimal financial assistance rules) and safety regulations"},{"label":"Monitoring Requirements","value":"Possible audits by OZEV; site inspections may be required"},{"label":"Doctoral Studentships","value":"Not specified"},{"label":"Industry Leverage Expectation","value":"Not specified"},{"label":"Funding Structure","value":"Covers 75% of installation and infrastructure costs (up to £15,000 per grant); up to £350 per chargepoint socket; up to £500 per parking space; maximum of 5 grants across 5 sites"},{"label":"Renewal Structure","value":"Not specified (scheme closing March 2026)"},{"label":"Environmental & EDI Requirements","value":"Supports transition to low-emission transport and sustainability objectives"},{"label":"important notes","value":"Chargepoints must be for staff and fleet use only (not public); minimum of 5 parking spaces must be enabled; installer must claim the grant on behalf of the applicant; grant deducted from installation invoice"}]

Quick facts

Status
Closed
Deadline
30 Mar 2026
Funding amount
Up to 75% of costs, max £15,000 per installation; up to £350/socket and £500/parking space with infrastructure
Funding band
Micro (<£50k)
Funding type
Capital grant
Payment type
Reimbursement
Audience
Business
Industry
All sectors (SMEs with fleet or staff parking infrastructure needs)
Last updated
9 Jun 2026
Published
31 Mar 2022

Source links

Secondary sources

Source 1