Skip to main content
Back to Grants Directory
ClosedBusiness

Electric Vehicle Infrastructure

UK Government · United Kingdom

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.

Overview

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.

Grant details

Application Components: Online application, installer details, property and parking details, company registration/VAT details

Application Platform: OZEV Electric Vehicle Chargepoint Grants online portal

Assessment Criteria: Eligibility compliance, correct installation setup, and adherence to scheme requirements

Decision Process: Grant claimed via installer after installation; OZEV reviews and approves claim

Decision Risks: Application rejection if requirements not met; audits may result in withdrawal if non-compliant

Doctoral Studentships: Not specified

Environmental & EDI Requirements: Supports transition to low-emission transport and sustainability objectives

Funding Structure: Covers 75% of installation and infrastructure costs (up to £15,000 per grant); up to £350 per chargepoint socket; up to £500 per parking space; maximum of 5 grants across 5 sites

Governance Requirements: Compliance with subsidy control (minimal financial assistance rules) and safety regulations

important notes: Chargepoints must be for staff and fleet use only (not public); minimum of 5 parking spaces must be enabled; installer must claim the grant on behalf of the applicant; grant deducted from installation invoice

Industry Leverage Expectation: Not specified

Ineligible Applicants: Businesses exceeding SME threshold or not properly registered

Ineligible Costs: Installations that are mandatory under building regulations or planning conditions; public-use chargepoints

Intent to Apply Deadline: Not specified

Key Organisational Requirements: Must be an SME; must not exceed £315,000 in minimal financial assistance over 3 financial years; must use OZEV-approved installer and eligible chargepoint

Match Funding Requirement: Business must cover remaining installation costs beyond grant contribution

Monitoring Requirements: Possible audits by OZEV; site inspections may be required

Project Start Date: After approval and installation arrangement

Renewal Structure: Not specified (scheme closing March 2026)

Quick facts

Status
Closed
Closing date
31 Mar 2026
Funding amount
Amount not specified
Funding type
Capital Grant
Audience
Business
Industry
Sector Agnostic

Official link